The Sir Otto Beit Bridge is a regional priority bridge within the North-South Corridor as described in Programme for Infrastructure Development in Africa providing connectivity by linking Zambia to Zimbabwe (and vice versa) across the Zambezi river at the Chriundu One stop Border Post.
The principal objective of the assignment is to assess the condition of the Sir Otto Beit Bridge, analyse its rehabilitation options and prepare detailed engineering designs and tender documentation to ensure a further 30 to 40 year service life under the loading conditions given and a regime limited to routine inspection and maintenance.
The Specific Objective is the technical and economic assessment and detailed design of rehabilitating the Sir Otto Beit Bridge in order to improve its load carrying capacity focusing on:
RELATED PROJECTS