Public-Private Partnership on Cultural Heritage, Peru
Detailed Design and Supervision of Marin Barleti Street and Lumbardhi Cinema in Prizren, Kosovo
Re-thinking the Sudan National Museum exposition in view of modern achievements of museology, Sudan
Implementation of the Long-Term Water and Sanitation Strategy (ILTWSS), Lesotho
Sustainable Training and Education Programme (STEP II) - Ethiopia
We have been awarded the "Survey, Assessment and Design for the Stabilization, Restoration & Rehabilitation of the Al Tahera Syriac Catholic Church, in Mosul, Iraq" project, financed by UNESCO.
The overall project aims to investigate and document the existing conditions and to produce the necessary architectural, structural, and services design drawings, specifications and bidding documents needed to solicit a contractor for the works related to the stabilization, restoration & rehabilitation of the al Tahera Syriac Catholic Church in Mosul, Iraq.
In particular, ARS Progetti will undertake the necessary surveys, documentation, and investigations in Mosul, in order to design the needed interventions related to the conditions of this important church and the associated cloister, nowadays in poor and hazardous conditions, after the intentional destructions inferred during the conflict ended in 2017.
Our Culture and Cultural Heritage Department, in consortium with SM Ingegneria srl, has been awarded the contract to manage the implementation in order to successfully reach the project objectives.
In particular, our team will ensure the overall supervision and coordination of work, as well as the implementation of specific activities like:
The contract will run from January 2021 until June 2023.
Thank you to our partners and experts for collaborating with us!
#ArsProgettiSPA #SuccessStories #ProjectAwarding
Public-Private Partnership on Cultural Heritage, Peru
Detailed Design and Supervision of Marin Barleti Street and Lumbardhi Cinema in Prizren, Kosovo
Re-thinking the Sudan National Museum exposition in view of modern achievements of museology, Sudan
Implementation of the Long-Term Water and Sanitation Strategy (ILTWSS), Lesotho
Sustainable Training and Education Programme (STEP II) - Ethiopia
Mid-Term Evaluation of "Strengthening Reconciliation Processes in Sri Lanka - FWC SIEA 2018 - LOT 3
Consultancy services for Preparing the Zanzibar Stone Town Conservation and Heritage Management Plan
Ghagha Island – Conservation Design Consultancy Services
Technical Assistance For EU-Turkey Anatolian Archaeology And Cultural Heritage Institute
Final Evaluation of the Non State Actors Programme in Papua New Guinea - FWC SIEA 2018 - LOT 3
Profondamente colpiti per la perdita di Paolo Dieci, presidente del CISP
BRIDGING THE GAP, Botswana and Zambia
Mr. Fernando de Souza Barbosa, our new Head of Office in Bruxelles
“Support to IPA 2019-2020 Programming in Bosnia and Herzegovina”- FWC SIEA 2018 - LOT 3
Estudio de Identificación en materia de Patrimonio Cultural – Peru - FWC SIEA 2018 - LOT 4
Seminario di approfondimento su "Europrogettazione e Fund Raising"
Assessment and prioritization of MoEYS construction needs, Cambodia - FWC SIEA 2018 LOT 4
Final Evaluation of the Electoral Support Programme, Nepal - FWC SIEA 2018 LOT 3
Regional Development and Protection Programme in Ethiopia - FWC SIEA 2018 LOT 3
Successfully awarded the new FWC SIEA 2018
Renforcement de la culture de la protection des données à caractère personnel au Maroc - LOT 7
Global - Evaluation of Call For Proposals Gender 2017 - LOT 7
Maroc - Refonte du système d’information de l’Institution du Médiateur du Royaume - Lot 7
Tourism Development Master Plan for Muscat Governorate - Oman
A.R.S. Progetti Official Sponsor of Cultural Tourism Middle East Forum
EU bridging Support to Diplomatic School at the Ministry of Foreign Affair - Armenia - LOT 7
Analysis on gender equality in Togo - Togo - LOT 7
Mission de suivi du programme "Réussir le Statut avancé" - Maroc - LOT 7
Final Evaluation of the Support Program to Civil Society Organizations (PAOSC II)- Mali - LOT 7
Final verification and approval of transformation works at new EUPSO premises - Cyprus - LOT 2
Feasibility Study for ACP - EU Political Dialogue -African, Caribbean and Pacific - LOT 7
Evaluation a Mi-percours du programme d'appui a l'Ordinnateur National Du FED au Tchad - LOT 7
Final Evaluation EDF 10th NAO Support - Liberia - LOT 7
Framework Contracts with the European Commission Worldwide: Beneficiaries 2013-2017
The publication "ARS Progetti's Perception", 20 years in business, now available on our home page.