Public-Private Partnership on Cultural Heritage, Peru
Detailed Design and Supervision of Marin Barleti Street and Lumbardhi Cinema in Prizren, Kosovo
Re-thinking the Sudan National Museum exposition in view of modern achievements of museology, Sudan
Implementation of the Long-Term Water and Sanitation Strategy (ILTWSS), Lesotho
Sustainable Training and Education Programme (STEP II) - Ethiopia
ARS Progetti has been awarded this assignment by the Ministry of Water, Water Commission of Lesotho.
The objective of the assignment is to fast track implementation of the Long-term water supply and sanitation strategy through identification and remedy of capacity bottlenecks that need to be addressed in order to ensure effective and efficient implementation of its strategic aims with emphasis on the Department of Rural Water Supply (DRWS) key focus areas.
The specific objective of the assignment is to build capacity of Local Councils to function as Water Service Authorities, (WSA), and other structures such as Water Service Providers (WSP), who would function as water service providers under the (WSA), and strengthen DRWS to be able to support these structures on the management and operations of water supply systems.
In particular, the assignment identifies and develops appropriate tools, guidelines and procedures to capacitate the councils and leadership structures to enable them to function as Water Service Authorities (WSA) and also other structures such as Water Service Providers (WSP) on the desired management and operation of water supply systems.
Public-Private Partnership on Cultural Heritage, Peru
Detailed Design and Supervision of Marin Barleti Street and Lumbardhi Cinema in Prizren, Kosovo
Re-thinking the Sudan National Museum exposition in view of modern achievements of museology, Sudan
Sustainable Training and Education Programme (STEP II) - Ethiopia
Mid-Term Evaluation of "Strengthening Reconciliation Processes in Sri Lanka - FWC SIEA 2018 - LOT 3
Consultancy services for Preparing the Zanzibar Stone Town Conservation and Heritage Management Plan
Ghagha Island – Conservation Design Consultancy Services
Technical Assistance For EU-Turkey Anatolian Archaeology And Cultural Heritage Institute
Final Evaluation of the Non State Actors Programme in Papua New Guinea - FWC SIEA 2018 - LOT 3
Profondamente colpiti per la perdita di Paolo Dieci, presidente del CISP
BRIDGING THE GAP, Botswana and Zambia
Mr. Fernando de Souza Barbosa, our new Head of Office in Bruxelles
“Support to IPA 2019-2020 Programming in Bosnia and Herzegovina”- FWC SIEA 2018 - LOT 3
Estudio de Identificación en materia de Patrimonio Cultural – Peru - FWC SIEA 2018 - LOT 4
Seminario di approfondimento su "Europrogettazione e Fund Raising"
Assessment and prioritization of MoEYS construction needs, Cambodia - FWC SIEA 2018 LOT 4
Final Evaluation of the Electoral Support Programme, Nepal - FWC SIEA 2018 LOT 3
Regional Development and Protection Programme in Ethiopia - FWC SIEA 2018 LOT 3
Successfully awarded the new FWC SIEA 2018
Renforcement de la culture de la protection des données à caractère personnel au Maroc - LOT 7
Global - Evaluation of Call For Proposals Gender 2017 - LOT 7
Maroc - Refonte du système d’information de l’Institution du Médiateur du Royaume - Lot 7
Tourism Development Master Plan for Muscat Governorate - Oman
A.R.S. Progetti Official Sponsor of Cultural Tourism Middle East Forum
EU bridging Support to Diplomatic School at the Ministry of Foreign Affair - Armenia - LOT 7
Analysis on gender equality in Togo - Togo - LOT 7
Mission de suivi du programme "Réussir le Statut avancé" - Maroc - LOT 7
Final Evaluation of the Support Program to Civil Society Organizations (PAOSC II)- Mali - LOT 7
Final verification and approval of transformation works at new EUPSO premises - Cyprus - LOT 2
Feasibility Study for ACP - EU Political Dialogue -African, Caribbean and Pacific - LOT 7
Evaluation a Mi-percours du programme d'appui a l'Ordinnateur National Du FED au Tchad - LOT 7
Final Evaluation EDF 10th NAO Support - Liberia - LOT 7
Framework Contracts with the European Commission Worldwide: Beneficiaries 2013-2017
The publication "ARS Progetti's Perception", 20 years in business, now available on our home page.