The main goal of this project is to contribute to improved water quality in Drina River downstream of Bajina Basta by developing its waste water collection and treatment including preparations for the set up of a waste water treatment plant (WWTP) in accordance with national and EU legislation. The specific objective of this assignment is to prepare a feasibility study with a preliminary design for the construction of the Waste Water Treatment Plant in Bajina Basta.
RELATED PROJECTS
Framework Contract “Culture and Information”