Back To Top
Language
Italiano
Français
Español
Русский
 
Education and training
A.R.S. Progetti
Governance
Economic and social development
Supervision Services for the Rehabilitation and Construction of Schools under Improving Secondary Education (ISEM) Programme - Malawi
Informal economy
Support to enhance livelihoods for people dependent on informal economy and improve social inclusion of marginalised and vulnerable persons
Monitoring and evaluation
Communication
Culture
Cultural heritage
Cultural Heritage and Urban Development Project (CHUD):
Consultancy Services For Baalbek and Tyre Archeological Project - Lebanon
Tourism
Technical Assistance to the Support Programme to the Strengthening of Culture and Art
for Social and Economic Development (ARCADES) - Haiti
Architecture
Design and tender documents for a theatre hall and cultural centre - Erbil, Iraqi Kurdistan
Architecture
Design and tender documents for an open amphitheater in Duhok - Iraqi Kurdistan
Urban Planning
Master Plans for 3 Sub Districts and a District Center, Ba'adre, Zawita, Bamarne and Shekhan,
in Duhok Governorate - Iraqi Kurdistan
Infrastructure engineering
Design of Structural Strengthening and rehabilitation of historic SiR Otto Beit Bridge on the
Zambesi river, border between Zambia and Zimbabwe






A.R.S. PROGETTI’S PERCEPTION



In several areas of Africa, when entering the territory of another tribe, one is required to bear a special "passport mask". This has a profound meaning: to neutralise one's roots and individuality as a sign of respect to those whose territory is being entered. In this there is an ancient wisdom, the sublimation of humanity's neutral essence. Quoting Aeschylus Agamemnon "Provided they respect the temples and the Gods of the vanquished, then shall the victors be saved".

ARS Progetti is a consulting firm working all over the world providing services, such as surveys, studies, design and technical assistance, mainly to public committers and for public interests, in fields related with governance and human development, culture and cultural heritage, social and physical infrastructure. Its overall mission is of a professional nature and consists in finding out, proposing and helping to implement solutions "which work", with reference to complex problems affecting extended social groups, regions, countries, groups of countries. Working on this ARS Progetti pursues the interest of its direct and "indirect" clients and project beneficiaries.












NEWS


Identification of the scope and preparation of the Terms of References for the Technical Assistance (TA) related to the Infrastructure Project Preparation and Capacity Building Facility foreseen under IPA 2015 programme for Albania - LOT 2

Mid-Term Review and “Options Paper” for the Participatory Initiative for Social Accountability - Lesotho - LOT 7

Mid-term evaluation of the rehabilitation works on the National Route n° 1 between Batshamba and the Loange Bridge and studies of the RN3 - Democratic Republic of Congo - LOT 2

Preparation of works tender dossier for construction/reconstruction of Public Prosecutor’s Offices countrywide - Macedonia - LOT 2

EU bridging Support to Diplomatic School at the Ministry of Foreign Affair - Armenia - LOT 7

Analysis on gender equality in Togo - Togo - LOT 7

Evaluation of Support to the Implementation of the Transport Sector Strategy of Ukraine - Ukraine - LOT 2

Mission de suivi du programme "Réussir le Statut avancé" - Maroc - LOT 7

Evaluation of EU interventions in the field of Security Sector Reform - Central African Republic - LOT 7

Review of Detailed Design and Bidding Documents and Assistance in Tender Evaluation for the Upgrading of Atiak – Laropi Road (66 km) to Paved Standard - Uganda - LOT 2

JOB OPPORTUNITIES


United Arab Emirates
Resident Office Manager ARS Progetti Abu Dhabi Branch
Lebanon
Expert 1: Law expert and Team Leader , category II – 30 working days.

Expert 2: IT expert, category II – 20 working days

Maroc
3 experts cat I 1 expert cat II
Albania
Capacity building (need assessment) expert - Cat I
Procurement expert - Cat II

Kosovo
A team of between two (2) and three (3) key experts is expected. One member of the evaluation team will be appointed as Team Leader. The minimum requirements of the team of key experts for this contract are as follows.
Egypt
Team Leader
Egypt
Senior Communication and Process Management Expert
Egypt
Senior Institutional / Legal Analyst Expert
Egypt
Senior Water Management Expert
Worldwide
Key experts available for short or medium term assignments - Lot 10: Trade and private sector

DOWNLOAD


ARS PERCEPTION


ARS 20 YEARS
download-ENGLISH
download-ITALIAN
download-SPANISH
download-FRENCH

Download here the new A.R.S. Progetti brochure in .PDF format.
Download the full brochure
Download the Cultural Heritage brochure









HIGHLIGHTS











 







 

17/10/2017
Identification of the scope and preparation of the Terms of References for the Technical Assistance (TA) related to the Infrastructure Project Preparation and Capacity Building Facility foreseen under IPA 2015 programme for Albania - LOT 2
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to strengthen the capacity and accountability of the Albanian administration to guarantee a sustainable role of Government in designing and implementing sector progammes and major infrastructure projects toward the improvement of connectivity within the country and the Western Balkan Region and in preparation for EU membership.

 

02/10/2017
Mid-Term Review and “Options Paper” for the Participatory Initiative for Social Accountability - Lesotho - LOT 7
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to provide PISA stakeholders, notably the EU Delegation (EUD), the office of the National Authorising Officer (NAO) in the Ministry of Finance (MoF), the management of GIZ/PISA and the members of the PISA NSC, with evidence to make an informed judgment about the past performance of the project, to document lessons learnt and to recommend possible adjustments or reorientation for the remaining period of project implementation and for the follow up phase.

 

28/09/2017
Mid-term evaluation of the rehabilitation works on the National Route n° 1 between Batshamba and the Loange Bridge and studies of the RN3 - Democratic Republic of Congo - LOT 2
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to fight the poverty of Congolese population by contributing to the restoration of the transport infrastructures and guaranteeing access to markets and social and administrative services.

 

19/09/2017
Preparation of works tender dossier for construction/reconstruction of Public Prosecutor’s Offices countrywide - Macedonia - LOT 2
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to contribute of improving the overall conditions of judicial institutions in the country, to a more effective justice sector reforms in line with EU and international standards.

 

07/09/2017
EU bridging Support to Diplomatic School at the Ministry of Foreign Affair - Armenia - LOT 7
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to strengthen the institutional capacity of MFA in order to establish the necessary capacities for timely preparation of negotiating positions, improved coordination among the relevant institutions in cross-cutting sectors as well as working groups involved in different areas of negotiation.

 

25/08/2017
Analysis on gender equality in Togo - Togo - LOT 7
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to improve information on gender equality and to include it in policies development in order to support the Government of Togo and the European Union to integrate gender programs and projects.

 

18/08/2017
Evaluation of Support to the Implementation of the Transport Sector Strategy of Ukraine - Ukraine - LOT 2
ARS Progetti has been awarded this assignment by the EC. The overall objective of the assignment is to identify key lessons and to produce recommendations to improve current and inform future choices on the sector reform contracts in Ukraine and on the cooperation between the EU in Ukraine in the transport sector.

 

16/08/2017
Mission de suivi du programme "Réussir le Statut avancé" - Maroc - LOT 7
ARS Progetti has been awarded this assignment by the EC. The overall objective of the program is to contribute to the implementation of the strengthened and deepened partnership with the Kingdom of Morocco in the the advanced status.

 

08/08/2017
Evaluation of EU interventions in the field of Security Sector Reform - Central African Republic - LOT 7
ARS Progetti has been awarded this assignment by the EC. The overall objective of the program is to strenghten the rule of law, the good governance, the administration of justice and to contribute to the development of a penitentiary system that takes into account international standards.

 

03/08/2017
Review of Detailed Design and Bidding Documents and Assistance in Tender Evaluation for the Upgrading of Atiak – Laropi Road (66 km) to Paved Standard - Uganda - LOT 2
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to undertake the review of the detailed design and bidding documents for the Atiak- Laropi road upgrading project and provide assistance in tender evaluation of the supervision and works contracts.

 

18/07/2017
Supervision Services for the Supply, Delivery and Installation of Quality Workshop Equipment and associated Rehabilitation and Construction of Technical and Vocational Education and Training Centres - Malawi - LOT 2
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to assist the Contracting Authority and the Programme Supervisor in the supervision of supply, delivery and installation of quality workshop equipment and rehabilitation and construction of TEVET centers located throughout the three main regions of the country.

 

17/07/2017
Final Evaluation of the Support Program to Civil Society Organizations (PAOSC II)- Mali - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to strengthen Malian CSOs to better participate in democratic processes, state reform and decentralization and to better play their roles as actors of development and social change.

 

17/07/2017
Appui à l'identification des sites pour la construction des commissariats, brigades territoriales et postes de la GNNT et pour les actions de gouvernance locale de la sécurité intérieure dans le cadre du PAASIT - Chad - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to support the local governance in order to reduce the climate of impunity and insecurity through the provision of security as a public good quality.

 

11/07/2017
Final verification and approval of transformation works at new EUPSO premises - Cyprus - LOT 2
ARS Progetti has been awarded this assignment by the EC. The global objective of this assignment is to facilitate the move of the EU Programme Support Office to new premises, thus ensuring uninterrupted, efficient, secure and safe implementation of the Aid Programme for the Turkish Cypriot community, for the benefit of this beneficiary community.

 

05/07/2017
Technical assistance to support the co-chairmanship of the Steering Committee of the Joint Secretariat RCPCA - Central African Republic - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to ensure the proper functioning of the Joint Steering Committee. While the specific obkective is to support the European Union in its role as co-chair of the Joint Steering Committee.

 

03/07/2017
Technical Assistance for the Development of the Action Plan of the National Strategy for the Fight against Irregular Migration - Niger - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to provide technical support to the Interministerial Committee on National Migration Policy to operationalize the Strategy for Combating Irregular Migration.The consultant shall formulate an implementation action plan in line with the strategic framework defined in the Strategy for Combating Irregular Migration.

 

07/06/2017
Mid-term evaluation of the strengthen capacities in the fight against money laundering project in West Africa (SAMWA) - Senegal - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to to contribute to the Strengthening of the Anti-Money Laundering Capacity Building project and to the achievement of its mail goals. The specific objectives are to provide West African and European stakeholders with an independent and motivated assessment of the relevance and performance of the project in mid-term: • Paying particular attention to the stage of implementation of the project in relation to the objectives set • By identifying lessons and recommendations for improving performance at the end of implementation and for future support in the process of formulation.

 

21/04/2017
Feasibility Study for ACP - EU Political Dialogue -African, Caribbean and Pacific - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the assignment is to provide a basis for a balanced consultation process of the ACP-EU Political Dialogue in the framework of the ACP-EU Cooperation, in order to achieve an inclusive dialogue and consultation process. By looking at the challenges, weaknesses and strengths of the process in the current cooperation, the study will also present guidance and new impetus on the political dialogue process in the successor agreement.Specific objective aim to highlight specific challenges, weaknesses and strengths or successes of the process of political dialogue (article 8) and consultations (article 96) in the current cooperation and use this study as a guidance on the political dialogue process in the successor agreement.

 

18/04/2017
Evaluation a Mi-percours du programme d'appui a l'Ordinnateur National Du FED au Tchad - LOT 7
L’objectif général de la prestation est celui du PAON à savoir contribuer à une mise en œuvre efficace et efficiente des financements du FED au Tchad et aux objectifs de développement durable et réduction de la pauvreté du gouvernement. L’objectif particulier de la prestation est de fournir aux différentes parties prenantes du programme les éléments leur permettant de se situer quant à l’état d’avancement du programme vers les résultats attendus et de prendre les mesures nécessaires pour l’atteinte des objectifs.

 

31/03/2017
Final Evaluation EDF 10th NAO Support - Liberia - LOT 7
ARS Progetti has been awarded this assignment by the EC. The global objective of the evaluation is to provide the relevant external co-operation services of the European Union, the partner government and, when appropriate, the wider public with an overall independent assessment of the past performance of the intervention Support to the NAO Office – Liberia.The Specific objectives are: • Assess the level of achievement of results of each of the commitments and their contribution to the overall objectives of the project, • Assess the level to which the chosen implementation modalities were appropriate for the achievement of the objectives. • Assess the degree with which improved infrastructure has contributed to the overall objective of the project (the evaluation will not be expected to assess the quality of the infrastructure) • Assess how and if the project has strengthened the NAO office to be a pro-active stakeholder in the wider aid management structure of Liberia and the strengthening of EU-Liberia cooperation.

 

28/03/2017
Final Evaluation of the EU-funded project "Supporting Measures to Combat Corruption and Money Laundering, and to Foster Asset Recovery, in Egypt" - LOT 7
ARS Progetti has been awarded this assignment by the EC.The main objective of the evaluation is to provide the relevant external co-operation services of the European Union, the partner government and, when appropriate, the wider public with: - an overall independent assessment of the past performance of the intervention "Supporting Measures to Combat Corruption and Money Laundering, and to Foster Asset Recovery, in Egypt", paying particularly attention to the results of the project against its objectives; - key lessons and recommendations in order to improve future action. The specific objective of this assignment is to conduct an independent Final Evaluation of the EU­ funded Project "Supporting Measures to Combat Corruption and Money Laundering, and to Foster Asset Recovery, in Egypt". The findings and recommendations of the Final Evaluation will support the EU Delegation and the Beneficiary Institutions in drawing lessons from the intervention implementation and recommendations in order to design future actions. Therefore the evaluation will focus both on operational and strategic aspects.

 

28/03/2017
Final evaluation of programmes "Community Based Approach for Local Development Phase III" and Support to Ukraine's Regional Development Policy - LOT 7
ARS Progetti has been awarded this assignment by the EC.The final evaluation will provide the Ukrainian authorities, implementers, the relevant external co-operation services of the European Commission and the European External Action Service, and the wider public with: - an overall independent assessment about the relevance of the action; - key lessons learned and recommendations on the management of ongoing actions in the area of regional/local development (in particular U-LEAD); and - advice on the main issues to be taken into account for the design and implementation of future interventions in the area of Decentralisation and local/regional development. The specific objectives of this final evaluation are: a) to assess the performance and impact of the two actions (CBA and SURDP): b) SURDP: to assess if and to what extent the project has contributed to the regional policy reform (especially State Regional Policy including State Fund for Regional Development), to assess the relevance of the EU intervention in this context; c) CBA: to assess if CBA has contributed and to what extent had impact on the success of the local self-government reform and administrative territorial reform (especially amalgamation of territorial entities), while pursuing its original objectives. d) to make an assessment of the two projects' visibility, information and communication; e) to identify and document key lessons learned by the two projects; f) to produce a set of recommendations that will assist the EU on the main issues to be taken into account the implementation of the recently launched programme U-LEAD as well as for the design and implementation of future interventions for regional and local development/ community mobilization.

 

09/03/2017
Feasibility Study for the Public-Private Partnership Project "Construction of Preschool Institutions (Kindergartens) in Minsk region, Belarus" - LOT 2
ARS Progetti has been awarded this assignment by the EC. The global objective of this assignment is to provide the Public Private Partnership Unit (PPP Unit) of the National Agency of Investments and Privatization and the Minsk Region Executive Committee (Minsk REC) with a feasibility study for the Public-Private Partnership pilot project "Construction of Preschool Institutions (Kindergartens) in Minsk region" in view of improving the social infrastructure of the Minsk region and promote regional development in Belarus. The specific objectives are: 1. To perform the organizational and legal project evaluation, elaboration of the most effective legal forms and project schemes based on a detailed analysis of the existing Belarusian legislation. 2. To conduct the financial evaluation of the project (capital expenditure - CAPEX) and operational expenditure - OPEX), including developing the most effective scheme of project funding based on the public-private partnership principles. 3. To conduct technical evaluation of the existing project design and estimate documentation and present recommendations for possible improvement based on best international practices, in close coordination with the proposed financial modelling. 4. To develop the specific mechanism of implementation of the project that can be replicated for other regions of Belarus.

 

16/10/2013
Framework Contracts with the European Commission Worldwide: Beneficiaries 2013-2017
ARS Progetti has been successfully awarded as Consortium Leader for Lot 2 "Transport and Infrastructures" and for Lot 7 “Human rights, civil society, governance, justice and Home Affairs”. Furthermore ARS Progetti was also awarded, as Consortium partner, to participate to the following other lots: Lot 3 "Telecommunications and information technologies"; Lot 6 "Environment"; Lot 10 "Trade and private sector"; Lot 12 "Humanitarian Aid, Crisis Management and Post-Crisis Assistance". These important awardings reaffirm ARS Progetti as one of the most reliable and qualified framework contractors in Europe

 

10/12/2012
The publication "ARS Progetti's Perception", 20 years in business, now available on our home page.

















Il presente sito utilizza cookies tecnici e cookies di terze parti. Continuando la navigazione ne accetti l'utilizzo. Clicca qui per prendere visione dell'informativa.